Building project; application for an isolated deviation from local building regulations

Service content

  • Description of the

    Under certain conditions, you can apply for a deviation from local building regulations for your project. A deviation from local building regulations is usually dealt with together with a building application. However, you can also apply for a deviation from local building regulations for projects that do not require a procedure. In this case, an isolated decision on the deviation is issued.

    Even if your project is authorised to deviate from local building regulations, it must still comply with the other public law requirements.

    The deviation from local building regulations is an intended discretionary decision. If the requirements for the deviation are met, it is usually granted, but it can also be refused in special cases.

  • Prerequisites

    You can apply for an isolated deviation from local building regulations if

    • your project is exempt from procedures and
    • the deviations are compatible with public interests, taking into account the purpose of the respective local building regulation and considering both legally defined overriding public interests and neighbouring interests protected under public law.
  • Deadlines

    none
  • Required documents

    Current cadastral extract

    Site plan

    (M 1 : 1,000 or 1 : 5,000)



    Construction drawings

    and any other relevant documents

    where required for the decision on the isolated deviation.
  • Costs

    The fees amount to 5% of the benefit you stand to gain from the deviation, but at least EUR 75.

  • Legal basis

  • Legal remedy

    You can challenge the municipality's decision on the isolated deviation from local building regulations with a complaint to the administrative court.
  • Procedure

    Written submission

    • Submit your application for an isolated exemption from local building regulations to the relevant local authority.
    • Also submit a justification and the required documents. The documents required are those that the municipality needs to be able to assess the facts of the case.
    • A specific form is not required.
    • A verbal application is not possible. If the deviation affects regulations that serve to protect neighbours, you should submit the application to your neighbours and obtain their consent before submitting it.
    • The municipality will review your application and make a decision. You will receive a written decision.

    Digital submission

    Digital submission of applications for isolated deviation is not yet possible throughout Bavaria. When selecting a location, the link to the online procedure is displayed if it is already offered.

    • The application for an isolated deviation from other building regulations can be submitted digitally using the online assistant. The documents are uploaded to the online assistant in electronic form (files in PDF format). Signatures are replaced by authentication using the "BayernID" user account or "My company account".
    • If the application is initially received by the lower building control authority, the latter shall forward it without delay to the relevant local authority.
  • Processing time

    The processing time depends on the scope and complexity of the project as well as the current capacity utilisation of the municipality.
Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language