Building project; application for a partial building permit

Service content

  • Description of the

    You may only start work on your building project once planning permission has been granted. This can take longer, especially for larger projects. With a partial building permit, you can start individual sections of the building project in advance. However, this only applies to the section for which you have been granted partial building permission.

    The part of your building project that is already covered by the partial building permit is no longer decided as part of the building permit.

  • Prerequisites

    You must first submit a building application. Only then can you apply for partial planning permission for part of the project.

    The partial building permit applied for is only granted if the project is subject to authorisation. Furthermore, the part of the project must not conflict with any public law regulations and the lower building supervisory authority must determine that the overall construction project is fundamentally permissible. The granting of the partial building permit is at the discretion of the lower building supervisory authority.

  • Deadlines

    Partial planning permission must be applied for before planning permission is granted.
  • Required documents


    Construction drawings

    Building specifications (see ‘Forms’ for the form)

    Cost estimate
    For fee purposes, you must state the estimated construction costs of the individual construction works.

    Building specifications
  • Costs

    The fees for a partial building permit amount to between 1 per thousand and 4 per thousand of the construction costs, depending on the type of construction project and the type of authorisation procedure. The fee is offset against the subsequent building permit fee.

  • Legal basis

  • Legal remedy

    If you do not receive the partial building permit you have applied for, you can file an administrative appeal. This should be directed at the granting of the partial building permit applied for. However, it is at the discretion of the lower building supervisory authority to grant the partial building permit. In principle, you do not have a legal claim to the granting of a partial building permit even if there are no public law regulations that conflict with the part of the project for which the partial building permit is being applied for.

    An objection is not possible.

  • Procedure

    Written submission

    First of all, please note that in the case of building applications for the construction and alteration of buildings, the building documents must be prepared by an authorised draftsman (architect, civil engineer; in the case of smaller building projects, especially detached and semi-detached houses, also master craftsmen in the building and carpentry trades and state-certified technicians specialising in construction technology). This also applies to the building documents for the application for partial building authorisation.

    • After submitting your building application, submit the partial building application with the required documents in writing to the lower building supervisory authority (district offices, independent cities, large district towns and certain larger municipalities) in whose area the building plot is located.
    • A specific form is not required. A verbal application is not possible.
    • The application must be signed by the client and the authorised designer.
    • The lower building supervisory authority examines the application and decides on it.
    • Before making a decision, the lower building supervisory authority must involve the authorities whose involvement or consultation is required by law for the decision on the building application or without whose opinion the suitability of the building application for approval cannot be assessed (e.g. the lower immission control authority, the lower water authority or the road traffic authority). However, this only applies if these authorities have not already commented on the overall building application. The municipal consent must already be obtained before the partial building permit is issued if it is required under building planning law.

    Digital submission

    Digital submission of applications for partial building permits is not yet possible throughout Bavaria. When selecting a location, the link to the online procedure is displayed if it is already offered.

    • The application for a partial building permit can be submitted digitally to the lower building supervisory authority using the online assistant.
    • The building documents are uploaded to the online assistant in electronic form (files in PDF format). The signatures of the client and the authorised designer are replaced by authentication using the "BayernID" or "My company account" user account.
    • In the case of applications for partial building permits where the building documents must be prepared by an authorised designer, the latter must authenticate himself and submit the application on behalf of the client.
  • Notes

    A partial building permit can be particularly useful for excavating a building pit, laying the foundations and constructing the basement. A granted partial building permit also contains the statement that the overall project is generally eligible for approval. In individual cases, however, you may not receive the building permit you applied for at a later date.

  • Processing time

    The processing time depends on the scope and complexity of the application, the number of agencies involved and the current capacity utilisation of the authority.
Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language