Diese Seite wurde automatisch übersetzt. Es kann daher zu Abweichungen oder Ungenauigkeiten im Text kommen. Verbindlich ist ausschließlich die Originalfassung. Rechtsansprüche aus Inhalten der übersetzten Version sind ausgeschlossen.

Building project; submission of documents for exemption from authorisation

Service content

  • Description of the

    In principle, an exemption from planning permission may be granted for all building works, with the exception of special structures. However, this is only possible under certain conditions (see ‘Conditions’). Even if a project is exempt from planning permission, it must still comply with all applicable regulations.

    Even if all the conditions for an exemption from planning permission are met, you are not automatically entitled to such an exemption. It is at the discretion of the local authority to decide whether or not to carry out a planning permission procedure.

  • Prerequisites

    The construction, alteration or change of use of a building may be exempt from planning permission under the following conditions:

    • The project is not a special-purpose building,
    • it falls within the scope of a detailed development plan or a project-specific development plan,
    • it complies with the provisions of the local development plan and any applicable local building regulations,
    • access is guaranteed and
    • This is not a domestic or commercial building project for which the local authority has, through a local development plan, excluded the application of the exemption from planning permission.

    Despite these conditions being met, the local authority may declare that a planning permission procedure is to be carried out.

  • Deadlines

    There are generally no deadlines.

    However, if you wish to commence construction more than four years after it has become permissible following an exemption procedure, you must go through the exemption procedure again.

  • Required documents





    Current extract from the land register

    Site plan

    Not required if the application relates solely to alterations to building structures where the external walls, roofs and use of the building remain unchanged.

    Construction drawings

    Building specifications (see ‘Forms’ for the form)
    Fire safety certificate
    , if applicable Only required if it is subject to building control inspection and is not already included in the other building documents.

    Where applicable, details of secured services regarding water and energy supply, as well as wastewater disposal and transport links

    Only required if the building project cannot be connected to a public water or energy supply or to a public wastewater disposal system. Also required if the building project does not border a public road with sufficient width.

    Where applicable, consent to the assumption of setback requirements (see ‘Forms’ for the form)
    Further documents
    where applicable Depending on the building project, further documents may be required, such as a tree inventory declaration. However, this is only required if the local authority so requests.
  • Forms

  • Costs

    There are no fees for exemption from the planning permission requirement. If the local authority informs you, before the one-month deadline has expired, that no planning permission procedure will be carried out, it may charge a fee for this if this is provided for in a local authority schedule of charges.

  • Legal basis

  • Legal remedy

    If the local authority states that the simplified planning permission procedure is to be followed, you have no right of appeal against this.
  • Further links

  • Procedure

    Written submission

    Please note, first of all, that for planning applications relating to the construction and alteration of buildings, the planning documents must be drawn up by a qualified designer (architect, civil engineer; for smaller building projects, in particular single-family and two-family houses, also master craftsmen in the building and carpentry trades and state-certified technicians specialising in building technology) must be drawn up. This also applies to documents submitted under the exemption from planning permission procedure.

    • Please submit the required documents to the local authority in whose area the building plot is situated.
    • The documents must be the same as those required for a planning application, together with the building plans, and must be submitted in triplicate using the prescribed forms.
    • You must notify the neighbours of the building plot of the building project no later than when you submit the documents to the local authority. It is preferable to involve the neighbours at an earlier stage by submitting the site plan and building plans to them for their approval.
    • The local authority may require a planning permission procedure to be carried out within one month of the documents being submitted. This means that the documents will automatically be processed as a planning application, provided you have indicated this on the planning application form. The lower building control authority is responsible for assessing the building application and making a decision on it.
    • If, on the other hand, the local authority does not request that the simplified planning permission procedure be carried out within one month, or if it informs you in writing that no planning permission procedure is to be carried out, your project is exempt from planning permission.

    Digital submission

    It is not yet possible to submit documents digitally as part of the exemption from planning permission procedure throughout Bavaria. When you select a location, a link to the online procedure will appear, provided it is already available.

    • The documents can be submitted digitally using the online wizard.
    • The standard building application and building specification forms are replaced by the questions in the online wizard. The building documents are uploaded to the online wizard in electronic form (PDF files).
    • The signatures of the client and the designer authorised to submit building plans are replaced by authentication via a ‘BayernID’ or ‘Mein Unternehmenskonto’ user account. In particular, the (large-format) construction drawings do not need to be signed either. They can therefore be generated directly as files within the designer’s CAD system. If the planning documents are to be drawn up by a designer authorised to submit planning applications, that designer must authenticate themselves and submit the documents on behalf of the client.
    • The documents are first sent to the lower-level building control authority, which forwards them immediately to the relevant local authority. The one-month period, at the end of which the project is exempt from planning permission, begins upon submission of the digital documents.
  • Notes

    If your building project is exempt from planning permission, you are personally responsible for ensuring that the conditions for the exemption are met and that the relevant public law regulations are complied with.

    Please note that even for building projects exempt from planning permission, you must notify the local building control authority of the start of construction at least one week in advance.

  • Processing time

    If the local authority does not inform you within one month of the submission of the required documents that the simplified approval procedure is to be carried out, you may commence work. This does not apply if the local authority applies for a provisional prohibition within one month of the submission of the required documents.

Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language