Building refurbishment; application for a certificate for tax purposes

Service content

  • Description of the

    The costs of maintaining and repairing buildings in designated regeneration areas or urban development areas can be reduced, in some cases significantly, through tax relief.

    In order to claim tax relief for modernisation and repair work carried out within regeneration areas and urban development zones, a certificate issued by the local authority must be submitted to the tax authorities.

    This certificate is issued by the relevant local authority upon application. Tax advisers can provide comprehensive advice on the details of any tax relief available.

    Measures leading to the construction of a new building are not eligible for tax relief.

    The costs of (construction) works, as well as grants from regeneration or development funding, must be specified in the application.

    The costs of modernisation and repair work, less any grants, may be deducted at a rate of up to 9% in the year of expenditure and in each of the following seven years, and at a rate of up to 7% in each of the subsequent four years.

    In the case of properties used to generate income, maintenance expenses may, at the taxpayer’s request, be spread over two to five years rather than being deducted in a single year. For owner-occupied properties, the construction costs may alternatively be deducted as special expenses at a rate of 9 per cent over a period of ten years.

  • Prerequisites

    The certificate may only be issued for modernisation and repair works carried out within designated regeneration areas and urban development zones.

    Before work begins, the regeneration area or urban development zone must be formally designated, and either a modernisation or repair order must have been issued by the local authority, or a written agreement regarding the modernisation or repair order must have been concluded between the owner and the local authority. If individual construction works have already been carried out, a certificate cannot be issued.

  • Deadlines

    none
  • Required documents

    The following documents are required:

    • Existing plans
    • Plans showing the measures
    • Modernisation or repair requirement or agreement
    • Original invoices (final invoices)
  • Costs

    25 to 600 EUR

  • Legal basis

  • Legal remedy

    Administrative court action

  • Further links

  • Procedure

    You must apply for the certificate from the relevant local authority.

    As part of the certification procedure, the relevant local authority checks whether the building is situated within a formally designated regeneration area or urban development zone, whether modernisation and repair works have been carried out, what the total expenditure was, and to what extent grants from public funds have been approved.

    The certificate issued by the local authority is to be submitted to the relevant tax authority for the purposes of assessing tax depreciation.

Please note that the texts on the services are published by the Bavarian State Ministry for Digital Affairs and can only be supplemented by us.

Responsible departments

Help with accessibility

  • General

    We endeavour to make our website accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view

Select language