During this period, a crane will be erected in front of the bank’s side entrance on Falterstraße. The outbound lane will therefore be closed. One lane will also need to be closed in front of the main entrance on Luitpoldstraße during this time. Traffic heading into the city centre will continue to flow as normal. During this period, Luitpoldstraße will be impassable from the direction of Königsplatz. Residents will still be able to access their homes. To allow the crane to be erected on Wednesday 4 November, Falterstraße must be closed to all traffic from 8 am to 4 pm.
Construction site
